Australia Xinhai Mining Services Pty Ltd
Ore: Gold
Capacity: 3001-6000t/d
Service Scope: EPCM+O, grinding, gravity, leaching, desorption-electrolysis
Proccess: Crushing – Grinding – Gravity Separation – Leaching – Desorption-Electrolysis – Tailings Recovery and Thickening

This project is a 6,000t/d gold processing plant located in Guinea. Xinhai Mining provided EPCM+O services, covering engineering design, construction drawings, and operational support.
The project consists of two main systems: a 2,400t/d tailings recovery system in the west area and a 3,500t/d crushing system in the east area. Based on ore characteristics and existing plant conditions, the process flow integrates tailings reprocessing with the original leaching system to improve overall resource utilization.
The project design was completed within the scheduled timeframe, and construction drawings were delivered to support on-site development.
The integrated flowsheet enables effective recovery of gold from both primary ore and tailings, improving overall resource efficiency and supporting stable plant operation.
