Australia Xinhai Mining Services Pty Ltd
Ore: Gold
Capacity: <300t/d
Service Scope: EPCM
Proccess: Two-Stage Closed-Circuit Crushing – Two-Stage Closed-Circuit Grinding – Gravity Separation + Cyanidation Leaching and Adsorption (CIL) – Desorption-Electrolysis – Smelting – Tailings Dry Stacking

This project is a 150t/d gold processing plant located in Tanzania. The plant was designed based on metallurgical test results and reference to similar CIP/CIL operations.
The ore is characterized by the presence of recoverable coarse gold alongside fine gold fractions. Based on these characteristics, a combined process of gravity separation and cyanidation leaching was adopted to improve overall recovery while maintaining a stable and efficient processing system.
The plant design provides a balanced solution for treating both coarse and fine gold fractions, achieving efficient resource utilization. The integrated gravity and cyanidation flowsheet supports stable operation, while the dry tailings stacking and water recycling system improves environmental performance.
