Zhangjiakou Chongli 300t/d Gold Processing Plant

Ore: Gold

Capacity: 300-1000t/d

Service Scope: EPCM+O

Proccess: Two-Stage Closed-Circuit Crushing and Screening – One-Stage Closed-Circuit Grinding and Classification – Gravity Separation + Flotation (1 Roughing, 2 Scavenging, 2 Cleaning) – Concentrate Dewatering

Zhangjiakou Chongli 300t/d Gold Processing Plant

Project Overview

This project is a 300t/d gold processing plant located in Chongli District, Zhangjiakou, China. Xinhai Mining was responsible for the engineering design, equipment supply, installation, and commissioning of the entire plant.

The ore is characterized by relatively fine gold dissemination, requiring adequate grinding and efficient separation to achieve optimal recovery. Based on ore properties and project requirements, a combined process of gravity separation and flotation was adopted to maximize gold recovery while ensuring stable plant operation and cost-effective performance.

Xinhai Solution

Major Equipment

  • Flotation Cells

    Flotation Cells

  • Jaw Crusher

    Jaw Crusher

  • Ball Mill

    Ball Mill

Project Achievements

The project was successfully commissioned and reached its designed capacity of 300t/d with stable and continuous operation.

Through optimized process design and equipment configuration, the plant achieved:

Efficient gold recovery through combined gravity and flotation processes 

Stable grinding and classification performance 

Reduced circulating load and improved energy efficiency 

Reliable concentrate dewatering and water recycling 

The overall system demonstrates strong adaptability to ore characteristics, ensuring long-term operational stability and economic performance.